OEM Hydrotester
- High Production
- Rates Low Installation & Operational Cost
- Long Seal Life
- Quick Seal Change
- Quick Changeover of Pipe Sizes
- Redundant Systems
- Continuing Operation
- Planned Maintenance
- Easy Access & Low Maintenance
- Custom Product Tracking & Recording System
- Internet Connectivity for Remote Troubleshooting
36” Hydrostatic Tester Cycle:
- Load Pipe
- Raise Spinner Rolls – Weld Line to 12 o’clock position
- Lower / Transfer
- Raise Vee Rolls – Pipe Length Measured
- Lower / Transfer
- Raise Pipe to Tester Centerline – Clamp to secure
- Test Heads Advance / Bury Pipe
- Pipe Filled
- Pipe Pressurized / Hold at Pressure / Record Test
- Intensifier relieves pressure / Heads Retract / Unclamp
- Lower / Transfer to Discharge Table.
- Cycle Completed / (3) Pipe in each step of cycle.